Skip to content

Stratton footbridge refurbishment

Works to refurbish the footbridge linking Sandgate to Griffiths Close in Stratton has begun.  This is a joint venture between Network Rail and the Council.

To make the bridge compliant for the overhead electrification, the bridge has new sides which are higher than before to ensure the public are safe from the overhead lines.

Network Rail’s contractor AMCO, are due to complete the work and open the bridge in June.


Back to top